case study: retrofit- kraft, texas
Kraft produces many different products in their Garland, Texas facility. Each product they produce requires its own unique operation and therefore operational environment. When at all possible, SES will try to limit the different types of fixtures used on a project to just one. However some projects like Kraft require multiple types of fixtures to achieve the desired results. This is a prime example of SES applying our operational experience to a customer’s situation in order to exceed our customers’ expectations.


case study: retrofit- kraft, texas
Type of Operation Manufacturing
Square Footage 225,000
Hours of Operation 7 Days/Wk, 24 Hrs/Day
Cost / Kilowatt $0.075
Competing Fixture 400W Metal Halide
Installed Fixture 4 Lamp T5 HO
Quantity of Fixtures 606
Mounting Height 22’
Retrofit Project Cost $179,000
Annual Energy Savings $89,000
Energy Rebate No Rebate Available
Project Payback 2.01 Years